Hard Material Industrial Robot Parts Mechanical Aluminium Robotic Arm Tubes

Short Description:


Product Detail

FAQ

Product Tags

Hard Material Industrial Robot Parts Mechanical Aluminium Robotic Arm Tubes Description

Product Name: Customized Robotic Welding Fabrication CNC Mechanical Parts Tolerance: 0.01-0.05mm
Service: Customized OEM Packing: Wooden Case
Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP) Keyword: Aluminium Arduino Robot Arm
High Light: industrial robot parts, robot hardware components

Hard Material Industrial Robot Parts Mechanical Aluminium Robotic Arm Tubes

CNC Custom Hard Material Mechanical Robot Arm Tubes Robotic Parts According to Drawing

machined components PartsBracket

Material: AL6061 Surface:Anodizing Concentricity:0.03mmTolerance:0.03-0.05mmL*W*H(mm)=250mm*100mm*130mmFlatness:0.03mm

Metal:F141,A6061,A5056,POM,45#,SKD11,DC53,SLD,S136.Machine:CNC processing center,CNC lathe,Wire cutting macine,Milling machine,Grinding machine,EDM.Surface treatment:sand blast,nickel plating,chrome plating,anodizing.Purpose:Robotic,Robot Arm,Robot For House Recration,Professional Service Robots.Hvac Pipe Inspection Robots.

Domestic Robot,Robot for Transportation,Mechanical Robot.Industrial Robot,Humanoid Robot,Combat Robot Parts.

Main Products Display

Hard Material Industrial Robot Parts Mechanical Aluminium Robotic Arm Tubes 0

Hard Material Industrial Robot Parts Mechanical Aluminium Robotic Arm Tubes 1

Processing all kinds of metal and plastic matenrials with the change of the times,the materials chosen by customers are changing constantly,in order to meet the different material needs of customers,we have accumulated a very rich and wide range of process characteristics and technical know-how of mechanical processing of metal and non-metal materials through continuous technological innovation and research and development.
Steel Stainless steel Aluminum Copper Plastic Surface treatment
1.2344 SUS303 A1050 C1020 PC High speed sand blasting
SUJ2 SUS304 A2017 C1100 PP Anodic oxidation
1095 SUS316 A2024 C145 MC Nickel plating
1212 SUS403 A5056 C147 POM Titanium plating
1566 SUS416 A5052 C5191 ABS Gold plating
S355 SUS420J2 A6020 C1220 PVC Silver plating
C22 SUS430 A6061 C360 PEEK Chrome Plated
C45 SUS630 A6063 Others PMMA Blacking
F125 17-4PH A6082 flame plating
F141 Abrasion
CK45
Others

Main Machining Machinery Display

Continuing to invest heavily in our facilities , we aim to bring you the most reliable,efficient and affordable metal component.our highly skilled and professional workforce is dedicated to satisfying the individual needs of all our customers and various markets the serve.
Processing type surface treatment Heat Treatment
CNC Machining nickel plating treatment
Multi-Axis CNC Machining Gold plating Passivation
CNC Turning Service silver plating Stress Removal Passivation
CNC Milling/Turning Multiple chrome plating Conditioning treatment
EDM Titanium plating quenching treatment
Thread Processing Blackening treatment Vacuum quenching treatment
wire cutting anodizing High cycle quenching
drilling Sandblasting Carburizing treatment
Gear working Chemical grinding salt-bath nitrocarburizing
stamping dacromet Tempering
laser cutting zinc plating Annealing treatment
Mechanical Parts Design powder coated
Parts Assemble phosphatizing

Production Capabilities Minimum Tolerance

Outer diameter dimension(turning Process) 0.01mm

Outer diameter dimension(centerless grinding process) 0.005mm

Outer diameter dimension(step grinding process) 0.005mm

Internal diameter dimension(turning process) 0.01mm

Center distance dimension( CNC milling process) 0.01mm

length,width,high(cnc milling process) 0.01mm

surface roughness Ra0.4a

Run-out 0.01mm

Roundness 0.01mm

Flatness 0.01mm

perpendicular 0.01mm

Hard Material Industrial Robot Parts Mechanical Aluminium Robotic Arm Tubes 2

Our advantages:

1. Precision Cnc stainless steel parts strictly according to customer's drawing,packing and quality request

2. Tolerance: Can be kept in +/-0.005mm

3. The most advanced CMM inspector to ensure the quality

4. Experienced technology engineers and well trained workers

5. Fast and timely delivery. Speedily&professional service

6. Give customer professional suggestion while in the process of customer designing to save costs.

7. Customers can use PAYPAL and other online payment platform to pay a small amount of sample fee

to shorten the sample production time

8. Quality assurance in accordance with ISO9001:2015

It is our goal to meet our customers’ expectation through good quality, fast delivery service, productivity

andContinuous improvement.Shenzhen Xinya Precsion machining Co., Ltd is to be your best choiceand

long-termpartner.

FAQ:

Q1: Could you give me your best price?

A1: Of course yes, we are a professional manufacturer, so we could supply the best price without many

middlemen.

Q2: If my quantity is very small, could you do my products?

A2: Yes, we can. Do not worry about the quantity. We will provide different production ways based on

your quantity.

Q3: How long would the delivery time?

A3: It is based on all of your requirements about the products.

Q4: How can you guarantee the quality?

A4: We have a powerful QC team to control the quality in every production process. We believe the

best quality is our enterprise life. That’s why we have lots of big group companies.

Q5: I want to buy your products, how can I make the payment?

A5: We can accept the T/T and western union.

Q6: Can XINYA make technical drawings for my design?

A6: We can provide a drawing for Manufacturing review according to your current 2D,3D CAD draft or

a sample offered by you. We of course will sign and adhere to any non-disclosure or confidentiality

agreement if your design is confidential.

Q7: How long can I get a quotation?

A7: We respond within 24 hours when receive an RFQ. Normally a quotation will take 1-3days. If there

is delayed, we will notify you as soon as possible.

Q8: How quickly can I get my parts?

A8: Lead times is normally 2-3 weeks when get your complete 2D and 3D CAD models from the order

date. Complex parts requiring or large quality order will take longer.We are able to be competent for

some urgently needed project as well.As for shipping, most of our shipments are via Express or by Air,

which will take 3-7days to your door.

Q9: What after-sales service can I get for any unsatisfied parts I receive?

A9: To ensure high quality of our machined components, we have detailed quality control system and

full-equipped measuring equipments. We guarantee all the dimension based on the information provided

by you. We have confidence in our ability to meet and exceed any reasonable expectations.

Q10: Is the material readily available?

A10: Depending on the material. The procurement / T is somewhat different, and most of the materials

can be delivered on the next business day. However, it may be difficult to incorporate materials in such

cases because it is often disturbed by the price of materials and the effect of social conditions.

Marketr and Service

We Are Committed To Fulfilling Your Needs,We Are Proud Of Your Every Success

Hard Material Industrial Robot Parts Mechanical Aluminium Robotic Arm Tubes 3


  • Previous:
  • Next:

  • Write your message here and send it to us